Building a pool in Orillia
Orillia sits between Lakes Couchiching and Simcoe at the gateway to cottage country, and that shapes its pool market: crews that build across Muskoka and Severn all pass through town, so homeowners get genuine choice of builders without paying full cottage-country travel rates. The older wards near downtown hold narrow lots and mature trees; the newer subdivisions spreading west and south have the wide, open backyards pools love. Winters here are proper snowbelt — cold, snowy, and long — which compresses the building season into a few busy months.
Permits and bylaw rules
Orillia's [Swimming Pool Fence By-law](https://orillia.civicweb.net/filepro/documents/search/?keywords=swimming&page=1&preview=310456) (Chapter 880 of the municipal code) generally requires a fence permit before you excavate for or build a pool. The City's [property permits page](https://www.orillia.ca/build-and-invest/permits-and-inspections/property-permits) links to the in-ground pool checklist, [BD.F.416](https://media-001-ca.cdn.govstack.com/orilliarecreation-004-ca/media/1m0ne22p/bdf416-inground-swimming-pool-20260806.pdf), which sets out the building permit process:
- A Zoning Certificate is required before you apply for the residential building permit.
- The application itself is a Building Permit Application accompanied by pool fence drawings and details showing enclosure compliance, an Undertaking & Indemnification Form for grading, and a detailed site plan showing pool and pool equipment setbacks from all property lines, buildings, easements, and septic tanks and beds (where applicable).
- Submission fees total $2,179.69: a $179.69 permit fee (2026 rate), a $350.00 grading review fee, and a $1,650.00 lot grading deposit (refundable after final review and a satisfactory inspection).
- The common reasons for application delays in Orillia are missing fence details, an incomplete site plan, missing setbacks, an unshown septic system, and missing grading documents.
The headline enclosure rules from the [property permits page](https://www.orillia.ca/build-and-invest/permits-and-inspections/property-permits):
- The pool fence must sit at least 1.5 m (5 ft) from the water's edge and stand at least 1.2 m (48 in) tall above finished grade.
- No raised deck, sundeck or raised ground within 1.5 m of the fence — yours or the neighbour's — unless the fence is extended at least 1.0 m beyond the raised feature.
- At most a 50 mm (2 in) gap under the fence, and no horizontal rails, braces or other climbable attachments on the outside.
- Gates match the fence in height and construction, self-close, self-latch near the top on the inside, and stay locked except while someone is present and supervising.
- The City publishes separate checklists for above-ground and in-ground pools and requires a signed in-ground swimming pool agreement with the application.
Lots, soil and ground conditions
Most of the city sits on glacial sand and gravel — ground that excavates quickly but can slough into an open dig without shoring. Heading north out of town toward Severn the granite of the Canadian Shield starts coming up close to the surface, and shallow rock is the soil story on rural-adjacent lots. Near Couchiching and the low ground toward the narrows, the water table runs high enough that a dug pool can weep; builders who know Orillia plan for dewatering rather than discovering it. Waterfront and near-shore lots can also face shore-land and conservation review — confirm with the City's planning staff before locking a layout.
The season
Digging starts after spring thaw, with the bulk of builds completed June through September. The swim season runs roughly late June to Labour Day — lake-moderated but short — and every pool must be closed before freeze-up: lines blown out, pump and heater winterized, cover secured against serious snow load.
What drives the price and what to ask
Quotes in Orillia swing on access into tight older-lot yards (crane or compact excavator time), dewatering near the lake, shoring in sandy ground, soil disposal, electrical and gas runs, the mandated fence and gate hardware, and scheduling inside a short, fully booked season.
Ask each pool builder:
- Who files the permit application through the e-Permit Portal, and how long is your lead time from signed contract to first dig?
- Who handles the zoning certificate and grading documents, and are those fees and deposits included in your quote?
- How will you handle the 1.5 m fence-to-water clearance and any raised decks near the fence line?
- What is your dewatering plan if the hole weeps, and how is it charged?
- On my lot, is shallow rock a risk — and what does rock excavation do to the price?
- What does the written warranty cover — shell, plumbing, liner, workmanship — and for how long?
- Are opening and closing included in the first year, and what do they cost after that?
